Water Supply Management
Development of Water Supply Master Plan. Future water demand projection and provide corresponding capital improvement solutions Read More
Wastewater and Stormwater Management
Development of Sewerage system Master Plan…Read More
Treatment Plant Solutions
Design of wastewater treatment plant (STP, ETP).Sludge management – provide solutions to problems with septic tank and other traditional methods..Read More
Socio-Economic Study
Preparation of Initial Environmental Examination (IEE), Social-Environmental
Impact Assessment…Read More
GIS and MIS Solutions
Customized software development, e.g. for environmental monitoring, asset
management, etc…Read More
Environmental Study
Socio-Economic Surveys related to infrastructure projects, Environmental Risk Assessment study…Read More
Doing the right thing,
at the right time.
0
0
0
0
Featured Projects
Reza Fashions Wastewater Management
Esolve assessed performance of wastewater management system and recommended improvements to meet regulatory compliance for current and future conditions.
Bhawal Resort Drainage Design
Esolve provided drainage solution to the Luxury Resort. A particular challenge was ensuring a solution which assimilates with the natural surroundings of the area within a limited space.
Technical Support
Provided various support services starting from data entry to drafting CAD drawings, analysis of data, digitization, material for presentation, reports etc.
Environmental Study At Sonargaon Museum
Youngone Corporation has currently restored a historical building in the Sonargaon Folk Art & Craft Museum complex. Youngone engaged ESOLVE International to identify effective treatment options for the restoration of the water quality of two ponds situated in the Sonargaon Folk Art and Craft Museum complex.
Socio-economic Study Of Kakonhat Pourashava
As per LGED requirement to prepare a master plan for Kakonhat, Mundumala and Tanore Pourashava under Rajshahi and ChapaiNawabganj Districts, a team was engaged to identify the Socio-economic profile of these pourashavas.
Technical Audit & Impact Assessment Of Sipp-ii
The technical audit was conducted based on surveys and visual inspections of each infrastructure, review of relevant Social Development Foundation (SDF) and Gram Samity (GS) documents and consultation with relevant SDF staff and GS NotunJibon members.
With a Difference
Would you like to speak to one of our consultants over the phone? Just submit your details and we’ll be in touch shortly. You can also email us if you would prefer.