SL | Project Title | Period | Region | Project Brief |
---|---|---|---|---|
1 | Topographic Survey for Designing Water Supply Pipe Line of Char Patharghata Area. Funded by: Taeyoung Engineering and Construction | 2021 | Char Patharghata, Chittagong, Bangladesh | Conducting Topographic Survey of the Char Patharghata Area including all structures in a specified buffer zone and RL of Roads. Preparation of survey maps/drawings for pipe line design and survey report. |
2 | EIA of Bridges Funded by; RHD/ IWM | 2021 | Moulvibazar, Bangladesh | Environmental Impact Assessment of proposed 2 nos. bridges for Roads and Highways Department. Baseline survey, impact identification and evaluation, Environmental Management Plan (EMP) preparation, EMP Budget and community consultations. |
3 | Training on COVID-19 Risk Management Funded by: ESOLVE CSR Fund | 2021 | Online | Training of Professionals in Bangladesh on how to work safely during COVID-19 pandemic. |
4 | Water Supply Network Design for Purbachal New Town Funded by: Rajuk/ IWM | 2021 | Online & Dhaka, Bangladesh | Design and Construction Supervision of Water Supply and Distribution Facilities at Purbachal New Town. |
5 | Training on Water Supply Network Design Funded by: IEB | 2021 | Dhaka, Bangladesh | Training of Engineering Professionals on planning, design and maintenance of water supply networks in an urban area. |
6 | EIA of Bridges Funded by: RHD/ IWM | 2020 | Feni, Narial, Netrokona and Mymensingh, Bangladesh | Environmental Impact Assessment of proposed 8 nos. bridges for Roads and Highways Department. Baseline survey, impact identification and evaluation, Environmental Management Plan (EMP) preparation, EMP Budget and community consultations. |
7 | Research into Flood Resilience Capacity Building Funded by: Concern Worldwide | 2020 | Gaibandha and Lalmonirhat, Bangladesh | Flood frequency analyses; Community level capacity building on flood resilience; study of Land use and role of Natural Capital in buffering flood impact, coping with flooding and recovery. Prepare a natural capital management strategy and brochures for communities. |
8 | Solid Waste Audit and Feasibility Study of Waste to Energy Project of Brisbane Market Funded by: Sustainable Solutions International Ltd. | 2020 | Brisbane, Australia | Conduct audit of waste input streams, estimate gas generation volumes, evaluate energy production benefits and conduct financial analyses for different scenarios. |
9 | Preparation of Environmental Management Framework Funded by: Danish Refugee Council | 2020 | Cox’s Bazar, Bangladesh | Analyses of environmental impacts of livelihood programme, conduct ESIA of waste management projects, Development Environmental Management Framework, prepare compliance Action pan, prepare Environmental Monitoring Plan and conduct stakeholder consultations. |
10 | Assessment of DRC’s programming in compliance with climate change policy of Bangladesh Funded by: Danish Refugee Council | 2020 | Cox’s Bazar, Bangladesh | Assessment of DRC’s programming in compliance with the environment and climate change policies, assessment of key geographical locations of Bangladesh affected by climate change and develop scenarios on displacement/climate refugees |
11 | Water Demand Survey Funded by: Taeyoung Engineering and Construction | 2020 | Chattogram, Bangladesh | Conduct survey of 12 nos. sites: built-up areas, commercial sites, institutions and industries. Estimate current and future (2041) water demands. |
12 | Feasibility Study of Waste to Energy Project of Gold Coast Turf Club Funded by: Sustainable Solutions International Ltd. | 2020 | Gold Coast, Australia | Assess waste input streams, estimate gas generation volumes, evaluate energy production benefits and conduct financial analyses. |
13 | Construction supervision and monitoring of rural piped water systems under the Arsenic Safe Union Project. Funded by: UNICEF | 2020 | Sylhet and Cumilla Districts of Bangladesh | Supervise construction and develop O&M modalities for 6 nos. water supply schemes including water treatment plants (WTPs) as well as 19 nos. arsenic-iron removal plants (In association with EIMS) |
14 | Gandarbhapur Water Treatment Plant (WTP) Site and Intake Facility Design Funded by: Ehsan Khan and Architects Ltd. | 2020 | Narayanganj, Bangladesh | Detailed design of non-process buildings (structural design) and infrastructures (road, drainage, water supply, wastewater and sewage treatment plant) as well as MEP works for Water Treatment Plant Site and Intake Site. |
15 | Detailed design of Bangabandhu Hi-Tech City 2 Block 6 and Conceptual Design for other Blocks Funded by: Vitti Sthapati Brindo Ltd. | 2020 | Gazipur, Bangladesh | Detailed design of wet infrastructures in Block 6: stormwater, water supply (incl. 6 MLD WTP), sewer network, treated effluent systems, sewage treatment plants (4 MLD, 1 MLD and 0.4 MLD STP) and sludge management facility. Conceptual design of infrastructure in other six Blocks. |
16 | Wastewater Treatment Plant (ETP) Design for Gas Exploration Site Funded by: CNRS | 2020 | Maheshkhali, Bangladesh | 4.2 m3/day wastewater treatment plant (ETP) design and construction supervision for safe disposal of slurry from gas exploration site. |
17 | Topography, road alignment, physical features survey and land acquisition plan for approx. 71km District Road Funded by: Noor Zaman Engineering Foundation | 2019-20 | Rangpur, Dinajpur and Gaibandah, Bangladesh | Topographical survey and physical feature survey, road cross-section survey, detailed land acquisition plan & earth volume calculation works for 70.6 km of district road in Rangpur Roads and Highways Division |
18 | Engineering Study of Detention Isolation Centres Funded by: Intl Committee of the Red Cross (ICRC) | 2020 | Rajshahi and Kishoreganj Bangladesh | Detailed Assessment of the decay of proposed COVID-19 Isolation Centres. Detailed design of proposed improvements. Supervision of contractors during refurbishment works. |
19 | Irrigation Modelling of Sites on Horn and Thursday Islands Funded by: Sustainable Solutions International | 2020 | Queensland, Australia | Estimation of daily, weekly, monthly and annual irrigation demands for average and peak conditions for two sites. Impacts of climate change also considered. |
20 | Technical Assessment of Water Supply and Drainage System of Cox’s Bazar Sadar District Jail Funded by: Intl Committee of the Red Cross (ICRC) | 2020 | Cox’s Bazar, Bangladesh | Testing of water quality, assessment of borewell hydrogeology and pumping capacity, water storages, water demand patterns, preparation of engineering drawings and tender documents for 80 m3/day WTP and other improvement works. |
21 | Hydrologic Assessment of Modhur Charrha Funded by: CNRS | 2019 | Cox’s Bazar, Bangladesh | Study of stream order, hydrologic drivers, pollution sources as well as GIS Mapping and contribute to Watershed Restoration Plan for UNHCR. |
22 | Survey and Infrastructure Design of Mirsharai Economic Zone Plot 22 Funded by: JDI | 2019 | Mirsarai, Bangladesh | Topographic, Ecological and Socio-Economic Surveys and Infrastructure Design of Roads, Water Supply (incl. 23,000 m3/day WTP), Drainage, Wastewater (15,000 m3/day ETP and 7,500 m3/day STP) and Power Systems. |
23 | Design of Water Distribution Network Funded by: Neptune Land Dev. Ltd. (United Group) | 2019 | Dhaka, Bangladesh | Survey and design of water supply pipe network with associated facilities for United City, which is a 137 acre private mixed residential development project. |
24 | Consultancy service for rural piped water system design under the Arsenic Safe Union Project. Funded by: UNICEF | 2019 | Sylhet, Cumilla and Satkhira Districts of Bangladesh | Feasibility assessment of proposed sites, identification of water sources, outline and detailed design of climate resilient water supply scheme in rural areas (including WTPs). Prepare tender documents. |
25 | Development of Environmental Monitoring Programme (EMP) Funded by: Sustainable Solutions International | 2019 | Queensland, Australia | Development of macros and coding in MS Excel to store and display environmental monitoring data for a site with sewage treatment plant and irrigation of treated wastewater. |
26 | Feasibility study, design specification, bid documents of Sewerage Treatment Plant (STP) and Sewerage Lines at Rayerbazar (Dhaka) catchment Funded by: DOHWA Eng. | 2019 | Dhaka, Bangladesh | Provision of technical support staff to Korean engineering team for preparation of documents and reports in English. |
27 | Development of Spatial Data Tool for Management of Legionnaire’s Disease Funded by: Sustainable Solutions International | 2019 | Queensland, Australia | Development of macros and coding in MS Excel to represent water quality database search results on building floor plans and layouts (e.g. hospitals and clinics) using unique symbology. The tool can be used to identify risk areas in the plumbing system. |
28 | Technical Assessment of Water Supply System of Cox’s Bazar Sadar Hospital Funded by: International Committee of the Red Cross (ICRC) | 2019 | Cox’s Bazar, Bangladesh | Testing of water quality, assessment of borewell hydrogeology and pumping capacity, inspection of reservoir condition, identification of internal and external plumbing, water treatment plant(WTP) design, preparation of engineering drawings and tender documents for improvement works. |
29 | Natural Capital Assessment Funded by: Concern Worldwide | 2019 | Gaibandha and Lalmonirhat, Bangladesh | Survey and evaluation of natural capital assets in 22 villages. Preparation of maps showing condition of different natural features and hazards affecting resilience of rural communities. |
30 | NRLX Site Storm Water Modelling Funded by: Sustainable Solutions International | 2018 | Queensland, Australia | Development of storm water (SWMM) and treatment (MUSIC) models for NRLX site. Evaluation of different storm water management options. |
31 | Vulnerability Mapping Funded by: Concern Worldwide | 2018 | Gaibandha and Lalmonirhat, Bangladesh | Collection and analyses of river water levels, topography and rural settlements. GIS analyses of key physical and socio-economic features. Generation of inundation depths. Calculation of statistics and ranking of Upazilas and Unions in terms of vulnerability to flood risks. |
32 | Feasibility Study of Reverse Osmosis Treatment Plant Funded by: Padma Bleaching and Dyeing | 2018 | Narayanganj, Bangladesh | Assessment of ETP performance, water demands, process design options, layout design, cost estimation and environmental assessment. |
33 | Survey of Mirsharai Economic Zone Plot 23 Funded by: JDI/JICA | 2018 | Mirsarai, Bangladesh | Topographic, Bathymetric, Ecological and Socio-Economic Surveys of Mirsharai Economic Zone Plot 23 |
34 | Detailed Design of Sewage Treatment Plant (STP) Funded by: Community Based Medical College (CBMC) | 2018 | Mymensingh, Bangladesh | Detailed design of sewage treatment plant for new hospital building with 1,500 people (50 m3/day STP). |
35 | Route Survey, Alternative Analyses and GIS Mapping for Gas Pipeline of Araihazar Economic Zone Funded by: JDI/JICA | 2018 | Narayanganj, Bangladesh | Reconnaissance, physical feature, topographic and route survey of gas transmission line from Haripur Power Plant (Bandar) to Araihazar propose economic zone location. Analyses of alternative routes were also undertaken through stakeholder consultations and technical analyses. |
36 | Water Supply and Drainage System Survey, Mapping, Modelling and Design Funded by: Water & Life, Bangladesh | 2017-2018 | Dhaka and Chittagong, Bangladesh | Infrastructure, topographic, water supply and drainage system survey. Development of DEM, hydrologic and hydraulic network models. Analyses of future scenarios (water demand, wastewater and stormwater runoff). Detailed design of water supply (incl. WTP) and drainage systems. Approval from relevant authorities (DWASA & CWASA). |
37 | National Water Balance System Project – Muda River Basin Design Funded by: Dept. of Irrigation and Drainage | 2016-2018 | Kedah and Penang, Malaysia | Conducting five studies: Water Balance, Demand Management, Environmental Flow, Water Resources Conservation Plan and Water-Energy-Food Nexus. Production of GIS maps. Stakeholder consultations at local and State level. Support to modelling team developing Decision Making Support System (DMSS). |
38 | Water Supply System Audit Funded by: Reza Fashions Ltd. | 2018 | Gazipur, Bangladesh | Investigation of water source arrangement, storage facilities, plumbing system and water quality. Recommendations for improving on-site water use efficiency. Development of a monitoring system to track water consumption throughout the building. |
39 | Sewage Treatment Plant Design and Construction Supervision Funded by: Reza Fashions Ltd. | 2017-2018 | Gazipur, Bangladesh | Investigation of feasible options for onsite wastewater treatment, detailed design of 85m3/day STP. |
40 | Rupayan Town Wet Infrastructure Design Funded by: Rupayan Housing Estate Ltd. | 2017-2018 | Narayanganj, Bangladesh | Assessment of water demands and design of water supply network (incl. 205 m3/day WTP). Assessment of wastewater generation rates and design of sewerage pipes and sewerage treatment plant (160 m3/day STP). Hydrologic analyses and drainage system design. |
41 | Environmental Study of Sonargaon Art & Craft Museum Complex Ponds Funded by: Young One Corporation | 2017 | Sonargaon, Narayanganj | Identify potential pollution sources of Sonargaon Sites and Feasibility Study of pond treatment options. |
42 | Drainage Assessment of Dhaka-Narayanganj-Dhemra Area Funded by: Esolve R&D Fund | 2015 | Dhaka, Bangladesh | Study of existing drainage system and problems, consultations with local stakeholders, development of hydrologic and hydraulic model, evaluation of options for reducing water logging and recommendation of drainage management strategies. |
43 | Low impact Drainage Solution for Resort Development in Bhawal Region Funded by: Amber Group | 2015 | Gazipur, Bangladesh | The resort is located in the lush setting of Bhawal forest. Esolve has developed a drainage solution for this 30 acre resort which will be in line with the green surroundings and protect resort from extreme storm events. |
44 | BESTWAY Group Land Development Project Funded by: Bestway Group | 2013 - 2014 | Dhaka, Bangladesh | Design of water distribution system (incl. WTP) for land development project using hydraulic modelling. Future demand was estimated for design purpose which included domestic, commercial and other facilities. A GIS database was developed for land use distribution. Sources of water supply were also identified. Plan and profile drawings for construction were prepared. |