Project List

Water Supply Projects

Sl Project Title Period Region Project Brief
1. Institutional and Financial Performance Assessment of Regional Urban Centers in Bangladesh

Funded by: World Bank

2026 Cumilla, Mymensingh, Rangpur, Bogura, Dinajpur, Jhenaidah, Jashore, and Shyamnagar Study to conduct a comprehensive institutional, financial, and performance assessment of urban water supply and sanitation (WSS) services to identify governance, operational, and financial gaps, and to develop performance improvement plans, financial sustainability roadmaps, and investment strategies to strengthen service delivery and long-term sustainability.
2. Chattogram Hill Tracts Inclusive and Resilient Urban Water Supply and Sanitation Project

Funded by: NJS CO., LTD.

2025 Bandarban, Lama, and Rangamati  Aims to improve public health and environmental conditions in Bandarban, Lama, and Rangamati through climate-resilient water supply, sanitation, and solid waste management infrastructure. The project includes the construction of surface water intakes, water treatment plants, reservoirs, and water transmission systems, while also strengthening institutional capacity and promoting improved hygiene practices.
3. Consultant Services for Detailed Engineering Design & Construction Supervision of Water Supply and Integrated Waste Management

Funded by: Department of Public Health Engineering (DPHE)

2024 Tungipara, Gopalganj, Bangladesh Data Collection and review of existing water supply, Review and updating population projection and future water demand, detail engineering design, drawing and technical specification of water supply components, preparation of detail engineering drawing and construction design of integrated waste management system
4. Design of Sustainable Rainwater, Wastewater Management, Water Supply, Fire Hydrant System, Electricity and Utility Duct in Bti The Grand Estate Project at Rejendrapur, Gazipur

Funded by; Building Technology
& Ideas Ltd. (BTI)

2023 Rajendrapur, Gazipur Design of Storm Water & Sewerage Management System, Water Supply & Fire hydrant System and Utility Duct
5. Feasibility and functionality assessment for rural piped water schemes and other alternative technologies under technical assistance to DPHE for strengthening institutional systems and arsenic mitigation initiatives in selected upazilas of Bangladesh. Funded by: UNICEF 2022 17 districts of Bangladesh The purpose of this assignment is to conduct feasibility assessments for new rural piped water schemes, prepare context specific design and cost estimates, and to conduct technical assessment of existing non-functional water systems (PWSS/ MAR/ PSF) with recommendations and cost estimates for full repair, rehabilitation, improvement, and O&M system development.
6. Catchment Water Assessment

Funded by: AWS

2023 Narayangonj & Gazipur,

Bangladesh

Assessment of the catchment of the study area & engagement of the Stakeholders
7. Urban Infrastructure Improvement Preparatory Facility

Funded By: NJS/DPHE/ADB

2021 Rangamati, Bandarban, Lama, Cumilla, Natore, Pabna & Ishwardi,

Bangladesh

Feasibility Study and Hydraulic Modelling of the existing and new water supply network of the hill towns (Rangamati, Bandarban & Lama). Situation Analysis, Feasibility study and Hydraulic Modelling of Cumilla and Ishwardi Cluster.
8. Water Supply Network Design for Purbachal New Town

Funded by: Rajuk / IWM

2021 Purbachal, Dhaka, Bangladesh Design and Construction Supervision of Water Supply and Distribution Facilities at Purbachal New Town
9. Topographic Survey for Designing Water Supply Pipeline of Char Patharghata Area.

Funded by: Taeyoung Engineering and Construction

2021 Char Patharghata, Chittagong, Bangladesh Conducting Topographic Survey of the Char Patharghata Area including all structures in a specified buffer zone and RL of Roads. Preparation of survey maps/drawings for pipeline design and survey report.
10. Training on Water Supply Network Design

Funded by: IEB

2021 Dhaka, Bangladesh Training of Engineering Professionals on planning, design, and maintenance of water supply networks in an urban area.
11. Water Demand Survey

Funded by: Taeyoung Engineering and Construction

2020 Chattogram, Bangladesh Conduct survey of 12 nos. sites: built-up areas, commercial sites, institutions, and industries. Estimate current and future (2041) water demands.
12. Gandharbpur Water Treatment Plant (WTP) Site and Intake Facility Design

Funded by: Ehsan Khan and Architects Ltd.

2020 Narayanganj, Bangladesh Detailed design of non-process buildings (structural design) and infrastructures (road, drainage, water supply, wastewater, and sewage treatment plant) as well as MEP works (HVAC, plumbing, electrical, fire safety and lightning protection) for Water Treatment Plant Site and Intake Site.
13. Detailed design of Bangabandhu Hi-Tech City 2 Block 6 and Conceptual Design for other Blocks

Funded by: Vitti Sthapati Brindo Ltd.

2020 Gazipur, Bangladesh Detailed design of wet infrastructures in Block 6: stormwater, water supply (incl. 6 MLD WTP), sewer network, treated effluent systems, sewage treatment plants (4 MLD, 1 MLD and 0.4 MLD STP) and sludge management facility. Conceptual design of infrastructure in other six Blocks.
14. Construction supervision and monitoring of rural piped water systems under the Arsenic Safe Union Project.

Funded by: UNICEF

2020 Sylhet and Cumilla Districts of Bangladesh Supervise construction and develop O&M modalities for 6 nos. water supply schemes including water treatment plants (WTPs) as well as 19 nos. arsenic-iron removal plants (In association with EIMS)
15. Hydrologic Assessment of Modhur Charrha

Funded by: CNRS

2019 Cox’s Bazar, Bangladesh Study of stream order, hydrologic drivers, pollution sources as well as GIS Mapping and contribute to Watershed Restoration Plan for UNHCR.
16. Design of Water Distribution Network

Funded by: Neptune Land Dev. Ltd. (United Group)

2019 Dhaka, Bangladesh Survey and design of water supply pipe network with associated facilities for United City, which is a 137-acre private mixed residential development project.
17. Survey and Infrastructure Design of Mirsharai Economic Zone Plot 22

Funded by:  JDI

2019 Mirsarai, Bangladesh Topographic, Ecological and Socio-Economic Surveys and Infrastructure Design of Roads, Water Supply (incl. 23,000 m3/day WTP), Drainage, Wastewater (15,000 m3/day ETP and 7,500 m3/day STP) and Power Systems.
18. Consultancy service for rural piped water system design under the Arsenic Safe Union Project.

Funded by: UNICEF

2019 Sylhet, Cumilla and Satkhira Districts of Bangladesh Feasibility assessment of proposed sites, identification of water sources, outline, and detailed design of climate resilient water supply scheme in rural areas (including WTPs). Prepare tender documents.
19. Technical Assessment of Water Supply System of Cox’s Bazar Sadar Hospital

Funded by: International Committee of the Red Cross (ICRC)

2019 Cox’s Bazar, Bangladesh Testing of water quality, assessment of borewell hydrogeology and pumping capacity, inspection of reservoir condition, identification of internal and external plumbing, water treatment plant (WTP) design, preparation of engineering drawings and tender documents for improvement works.
20. NRLX Site Storm Water Modelling

Funded by: Sustainable Solutions International

2018 Queensland, Australia Development of storm water (SWMM) and treatment (MUSIC) models for NRLX site. Evaluation of different storm water management options.
21. Vulnerability Mapping

Funded by: Concern Worldwide

2018 Gaibandha and Lalmonirhat, Bangladesh Collection and analyses of river water levels, topography, and rural settlements. GIS analyses key physical and socio-economic features. Generation of inundation depths. Calculation of statistics and ranking of Upazilas and Unions in terms of vulnerability to flood risks.
22. Water Supply System Audit

Funded by: Reza Fashions Ltd.

2018 Gazipur, Bangladesh Investigation of water source arrangement, storage facilities, plumbing system, and water quality. Recommendations for improving on-site water use efficiency. Development of a monitoring system to track water consumption throughout the building.
23. Water Supply and Drainage System Survey, Mapping, Modelling and Design

Funded by: Water & Life, Bangladesh

2017-2018 Dhaka and Chittagong, Bangladesh Infrastructure, topographic, water supply and drainage system survey. Development of DEM, hydrologic and hydraulic network models. Analyses of future scenarios (water demand, wastewater, and stormwater runoff). Detailed design of water supply (incl. WTP) and drainage systems. Approval from relevant authorities (DWASA & CWASA).
24. National Water Balance System Project – Muda River Basin Design

Funded by: Dept. of Irrigation and Drainage

2016-2018 Kedah and Penang, Malaysia Conducting five studies: Water Balance, Demand Management, Environmental Flow, Water Resources Conservation Plan and Water-Energy-Food Nexus. Production of GIS maps. Stakeholder consultations at local and State level. Support to modelling team developing Decision Making Support System (DMSS).
25. Rupayan Town Wet Infrastructure Design

Funded by: Rupayan Housing Estate Ltd.

2017-2018 Narayanganj, Bangladesh Assessment of water demands and design of water supply network (incl. 205 m3/day WTP). Assessment of wastewater generation rates and design of sewerage pipes and sewerage treatment plant (160 m3/day STP). Hydrologic analyses and drainage system design.
26. BESTWAY Group Land Development Project

Funded by: Bestway Group

2013 – 2014 Dhaka, Bangladesh Design of water distribution system (incl. WTP) for land development project using hydraulic modelling. Future demand was estimated for design purposes which included domestic, commercial, and other facilities. A GIS database was developed for land use distribution. Sources of water supply were also identified. Plan and profile drawings for construction were prepared.

Environmental Projects

Sl Project Title Period Region Project Brief
1.         Technical Audit and Impact Assessment under the Resilience, Entrepreneurship and Livelihood Improvement Project (RELIP)

Funded by: Social Development Foundation (SDF)

2026 20 districts Study to conduct a comprehensive technical, environmental, and socio-economic assessment to verify the quality, compliance, cost-effectiveness, and sustainability of community infrastructure and livelihood sub-projects implemented under the Resilience, Entrepreneurship and Livelihood Improvement (RELIP) Project, generating evidence-based findings and actionable recommendations to strengthen implementation and future planning.
2.         Environmental Impact Assessment (EIA) of Important Large Bridges under the Upazila, Union, and Village Road Project (LGED – LBSP-1)

Funded by: RHD/IWM

2026 19 districts Study to conduct a comprehensive Environmental Impact Assessment (EIA) for proposed large bridge structures to identify baseline conditions, assess potential environmental and social impacts, and develop site-specific mitigation and management measures to support environmentally sound and socially acceptable rural connectivity investments.
3.         Environmental Assessment and Drainage Study for Cox’s Bazar Municipality Integrated Waste and Sanitation Management Zone at Ramu, Cox’s Bazar

Funded by: BRAC/World Bank/SACEP/ UNOPS

2025 Ramu,Cox’s Bazar Environmental and Drainage Study of the Integrated Waste and Sanitation Management Zone at Mithachhori, Ramu, under Cox’s Bazar Municipality, which includes a Plastic Recycling Facility, a Faecal Sludge Treatment Plant, and a Composting Plant operating within an integrated site. The study assesses existing environmental conditions, drainage patterns, and flood risks associated with the operation of these facilities, and examines the effects of site development and land use changes on natural drainage and surface water flow.
4.         Ecological Assessment to support Environmental Impact Assessment (EIA) for Sustainable Management of the Gorai River Basin Including Offtake

Funded by: BWDB/IWM

2025 Magura, Kushtia, Khulna and Mongla Study to conduct a focused ecological assessment to identify baseline ecological conditions, sensitive habitats, and potential impacts on flora and fauna, and to recommend appropriate mitigation and management measures to support environmentally sustainable project planning and implementation.
5.         Initial Environmental Examination (IEE) of Sreemangal–Moulvibazar Bypass Road

Funded by: RHD/IWM

2025 Sreemangal, Moulvibazar Study to conduct an Initial Environmental Examination (IEE) for the proposed bypass road to identify baseline environmental conditions, assess potential environmental and social impacts, and recommend mitigation and environmental management measures to support environmentally sound road development and regulatory clearance.
6.         Consultant/Consulting Firm to conduct assessment and develop climate-adaptive framework, strategy and action plan for BRAC Skills Development Programme

Funded by: BRAC

2024 Dhaka, Chattogram, Rajshahi, Khulna, Sylhet The task involves enhancing BRAC’s Skills Development Programme (SDP) by integrating climate-adaptive strategies and green job training, in alignment with BRAC’s Climate Change Strategy and Environmental Safeguard Framework. This includes assessing SDP’s existing programs, identifying areas for climate resilience improvements, and defining a climate-focused narrative. The plan will guide curriculum updates, climate-adaptive infrastructure development, and capacity-building for staff.
7.         National Consultancy Support for Investment Identification and Scoping under Dhaka River Restoration – Umbrella Investment Program (UIP)

Funded by: World Bank

2024 Narayanganj, Savar Rapid sector diagnostics for priority sectors (wastewater, solid waste, industrial effluent and other pollution sources, urban development , river front, canal rehabilitation, river flow management, flood management and drainage, water borne transportation and linked mobility/transport infrastructure), Investment identification and screening for risks, impacts and implementation readiness, and Prioritization and scoping of investments with indicative cost estimates.
8.         Environmental Impact Assessment (EIA) for 1000 MW Solar Power Plant in Char Harirampur of Faridpur District

Funded by: Beximco Power Company Limited/IWM

2023 Char Harirampur, Char Bhadrasan Upazila, Faridpur, Dhaka A detailed report on the Environmental Impact Assessment (EIA) with policy and regulatory framework, assess baseline conditions, screen environmental impacts, identify mitigation measures, analyze alternatives, and develop reports and an Environmental Management Plan to obtain project approval, focusing on addressing environmental concerns throughout the project lifecycle.
9.         Environmental & Social Impact Assessment and Preparation on an Environmental and Social Management Framework for Pilot Non-Network Sanitation System in Chattogram City

Funded by: Waste Concern

2023 Chittagong,

Bangladesh

Preparation of ESIA and ESMF as per World Bank Environmental and Social Framework for proposed non-network sanitation interventions for CWASA.
10.      Environmental Impact Assessment for Jatra Osiris Data Center.

Funded by JATRA/Vitti Sthapati Brindo Ltd.

2023 Gazipur,

Bangladesh

Environmental Impact Assessment of a Data Center Infrastructure in Bangabandhu Hi-Tech City (Block 6). Review of development activities, policies, laws and regulations, baseline survey, impact identification and evaluation, Environmental Management Plan (EMP) preparation, community consultations and obtain ECC from DoE
11.      Climate Change & Environmental Impact Assessment (EIA) under Restoration of Water bodies for Sustainable Water

Management in Dhaka Watershed. Funded by: IWM/DWASA

2022 Dhaka,

Bangladesh

Study to perform a detailed analysis to identify the potential environmental and climate change related vulnerabilities associated with the proposed restoration measures of the water bodies.
12.      Environmental Impact Assessment for BSMSN Sheikh Hasina Sharobar. Funded by: BEZA/Vitti Sthapati Brindo Ltd. 2022 Mirsarai,

Chattogram,

Bangladesh

Baseline survey and assessment, identification of potential project impacts, development of environmental management plan with budget and implementation arrangements.
13.      ToT of Environmental, Climate Change & Disaster Risk Reduction Awareness Program

Funded by: FIDA International

2022 Dhaka, Bangladesh FIDA is an international NGO where they support several primary schools. This project was initiated to increase environmental, climate change and disaster awareness amongst the school and the surrounding community.
14.      Environmental Impact Assessment (EIA) and field surveys under BWDB Project

Funded by: IWM/DWASA

2022 Shariatpur, Bangladesh EIA study and Pertinent field surveys for Protection of Char Tarabunia area from Right Bank Erosion of the Padma River
15.      Hydro-Morphological Study and EIA of Bridges

Funded by: RHD / IWM

2022 Narayangonj, Bangladesh Environmental Impact Assessment of proposed 2 nos. bridges at Meghna.

Economic Zone connecting road and with approach road at Cumilla.

Economic Zone connecting road

16.      Hydro-Morphological Study and EIA of Bridges

Funded by: RHD / IWM

2021 Pabna, Bangladesh Environmental Impact Assessment of proposed 2 nos. bridges (Naradaha and Khaschar). Baseline survey, impact identification and evaluation, Environmental Management Plan (EMP) preparation, EMP Budget and community consultations.
17.      Hydro-Morphological Study and EIA of Bridges

Funded by: RHD / IWM

2021 Munshigonj, Bangladesh Environmental Impact Assessment of proposed Kunderbazar Bridge. Baseline survey, impact identification and evaluation, Environmental Management Plan (EMP) preparation, EMP Budget and community consultations.
18.      Updating of ESIA of Araihazar EZ

Funded by: BEZA/IWM

2021 Narayanganj, Bangladesh Environmental Social Impact Assessment of Economic Zone, including gas transmission pipeline and power plant. Baseline survey, impact identification and evaluation, Environmental and Social Management Plan (ESMP) preparation, ESMP Budget and stakeholder consultations.
19.      EIA of ORYX Biotech Pty Ltd.

Funded by: ORYX/Vitti Sthapati Brindo Ltd.

2021 Gazipur, Bangladesh Environmental Social Impact Assessment of Plasma Fractionation Plant in Bangabandhu Hi-Tech City (Block 2). Baseline survey, impact identification and evaluation, Environmental Management Plan (EMP) preparation, EMP Budget and community consultations.
20.      Consultancy services to prepare a Training Manual on

Environmental & Social Management Framework (ESMF)

Funded by ITN-BUET

2021 Cox’s Bazar, Bangladesh Development of a comprehensive ‘Training Manual’ on ESMF for capacity building training for communities and selected government officials.
21.      EIA of Bridges

Funded by: RHD / IWM

2021 Moulvibazar, Bangladesh Environmental Impact Assessment of proposed 2 nos. bridges (Kushiara & Monu) for Roads and Highways Department. Baseline survey, impact identification and evaluation, Environmental Management Plan (EMP) preparation, EMP Budget and community consultations.
22.      EIA of Bridges

Funded by: RHD / IWM

2020 Feni, Narial, Netrokona and Mymensingh, Bangladesh Environmental Impact Assessment of proposed 8 nos. bridges for Roads and Highways Department. Baseline survey, impact identification and evaluation, Environmental Management Plan (EMP) preparation, EMP Budget and community consultations.
23.      Preparation of Environmental Management Framework

Funded by: Danish Refugee Council

2020 Cox’s Bazar, Bangladesh Analyses of environmental impacts of livelihood programme, conduct ESIA of waste management projects, Development Environmental Management Framework, prepare compliance Action pan, prepare Environmental Monitoring Plan, and conduct stakeholder consultations.
24.      Topography, road alignment, physical features survey and land acquisition plan for approx. 71km District Road

Funded by: Noor Zaman Engineering Foundation

2019-20 Rangpur, Dinajpur and Gaibandah, Bangladesh Topographical survey and physical feature survey, road cross-section survey, detailed land acquisition plan & earth volume calculation works for 70.6 km of district road in Rangpur Roads and Highways Division
25.      Development of Environmental Monitoring Programme (EMP)

Funded by: Sustainable Solutions International

2019 Queensland, Australia Development of macros and coding in MS Excel to store and display environmental monitoring data for a site with sewage treatment plant and irrigation of treated wastewater.
26.      EIA of Bridges

Funded by: RHD / IWM

2019 Kishoreganj, Bangladesh Environmental Impact Assessment of proposed 2 nos. bridges for Roads and Highways Department. Baseline survey, impact identification and evaluation, Environmental Management Plan (EMP) preparation, EMP Budget and community consultations.
27.      EIA of Bridges

Funded by: RHD / IWM

2018 Shariatpur, Bangladesh Environmental Impact Assessment of proposed 3 nos. bridges for Roads and Highways Department. Baseline survey, impact identification and evaluation, Environmental Management Plan (EMP) preparation, EMP Budget and community consultations.
28.      Environmental Study of Sonargaon Art & Craft Museum Complex Ponds

Funded by: Young One Corporation

2017 Sonargaon, Narayanganj,

Bangladesh

Identify potential pollution sources of Sonargaon Sites and Feasibility Study of pond treatment options.

Drainage & Sewer Related Projects

Sl Project Title Period Region Project Brief
1.         Bangladesh City Inclusive Sanitation Project in 25 Towns

Funded by: Department of Public Health Engineering (DPHE)/Sheltech Consultants Private Limited (SCPL)

2024 25 Pourshavas of Bangladesh The Project aims to improve access to inclusive urban sanitation services in selected 25 cities. The assignment provided technical and design support for urban water supply and drainage infrastructure, including review of project requirements, topographical data, rainfall information, hydraulic calculations, and population demand. The services covered guidance on pipe sizes, materials and layouts, as well as the design of drains, culverts, channels, and retention/detention structures to manage stormwater runoff efficiently.
2.         Hydrological and drainage Study of Cox’s Bazar under Master Plan Preparation for Cox’s Bazar Project

Funded by: CoxDA/CSC/EK Architect-Mango-JV

2024 Cox Bazar Upazila, Bangladesh The Cox’s Bazar Development Authority (CoxDA) has initiated a comprehensive project to prepare a Master Plan aimed at fostering sustainable development in the Cox’s Bazar Upazila. This study involves detailed analysis and mapping of surface and groundwater systems, assessment of water quality, and evaluation of hydrological impacts due to climate change and urbanization. The drainage study involves determination of predevelopment and post development storm water flows based on storm duration equal to the time of concentration
3.         Supply of Design, drawings and technical support for STP

Funded by: Community Based Medical College Bangladesh (CBMCB)

2024 Churkhai, Mymensingh, Bangladesh Evaluation of existing sewage infrastructure and client requirements, Identification of regulatory standards and environmental factors, Developing preliminary STP design concepts, preparation of comprehensive engineering drawings and specifications.
4.         Faecal Sludge Management and Onsite Sanitation Improvements for PESSCM-1/W2 Funded by: JV of Zhongnan Engineering Corporation Ltd and Sinohydro Corporation Ltd 2024 North Agrabad, Chittagong, Bangladesh Design of collection, and transport model for faecal sludge; Enhancing efficiency and effectiveness of FSM strategies, Develop vehicle configuration for effective transport of faecal sludge, Prepare and identify site specific detailed design solutions for existing and new toilets
5.         Design for Sewerage Network

Funded by: JV of Zhongnan Engineering Corporation Ltd and Sinohydro Corporation Ltd

2023 North Agrabad, Chittagong, Bangladesh Design for Sewerage Network of CWASA Catchment 1, W2 Package of 50 kilometer for a 100 MLD Sewage Treatment Plant
6.         Tender Preparation Support Service for DWASA WD5 A & WD5 B

Funded by: Stecol Corporation

2023 Dhaka,

Bangladesh

Professional and experienced designing entity capable of performing the works within the scope specified herein and is willing to provide technical support during the tender stage.
7.         Design Drainage System to Eliminate Waterlogging on Dhaka Mymensingh Highway

Funded by: Dhaka North City Corporation

2023 Dhaka,

Bangladesh

Conduct study to improve the drainage system of Dhaka Mymensingh Road near Uttara Model Town and Hazrat Shahjalal International Airport
8.         Design for Sewerage Network

Funded by: China Civil Engineering Construction Corporation Ltd. (CCECC)

2022 Agrabad, Chittagong, Bangladesh Design for Sewerage Network of CWASA Catchment 1, W3 Package of 50 kilometer for a 100 MLD Sewage Treatment Plant
9.         Design for Sewerage Network

Funded by: Taeyoung Engineering & Construction

2022 Halishar, Chittagong, Bangladesh Design for Sewerage Network of CWASA Catchment 1, W1 Package of 90 kilometer for a 100 MLD Sewage Treatment Plant
10.      Development of Manda Khal and Jirani Khal

Funded by: Dhaka South City Corporation (DSCC)/EKAR

2022 Dhaka Conducted environmental and baseline assessments for the Manda-Jirani canal system, including IEE preparation, environmental screening, impact assessment, and EMP development. Carried out catchment analysis, hydrologic and hydraulic modeling, canal surveys, flow assessments, and water quality investigations across the project area. Assessed sanitation, wastewater, and solid waste conditions, identified major pollution sources, and developed conceptual stormwater and wastewater management solutions, including STP, DEWATS, and ABR-based treatment options for improved drainage and water quality management.
11.      CAAB Residential Area Drainage and STP Design. Funded by: Civil Aviation Authority Bangladesh/NOCD 2022 Dhaka, Bangladesh Update/Modification of the Existing Drainage System design and STP solution for CAAB Residential Area of 1 SqKm.
12.      Update/Modification of the Existing Wet Infrastructure for Hazrat Shah Jalal International Airport.

Funded by: Civil Aviation Authority Bangladesh/NOCD

2022 Dhaka, Bangladesh Assessment of the existing Water, Drainage and Sewerage System of the entire airport area under Terminal 1, 2 and Domestic Terminal and provide recommendation for update and modification with detailed design.
13.      Supervision work for drainage cleaning of HSIA. Funded by Civil Aviation Authority Bangladesh/NOCD 2022 Dhaka, Bangladesh Drainage Cleaning Supervision Work for Hazrat Shahjalal International Airport of the entire drainage network and the outfalls.
14.      Solid Waste Audit and Feasibility Study of Waste to Energy Project of Brisbane Market

Funded by: Sustainable Solutions International Ltd.

2020 Brisbane, Australia Conduct audit of waste input streams, estimate gas generation volumes, evaluate energy production benefits, and conduct financial analyses for different scenarios.
15.      Wastewater Treatment Plant (ETP) Design for Gas Exploration Site

Funded by: CNRS

2020 Maheshkhali, Bangladesh 4.2 m3/day wastewater treatment plant (ETP) design and construction supervision for safe disposal of slurry from gas exploration site.
16.      Technical Assessment of Water Supply and Drainage System of Cox’s Bazar Sadar District Jail

Funded by: Intl Committee of the Red Cross (ICRC)

2020 Cox’s Bazar, Bangladesh Testing of water quality, assessment of borewell hydrogeology and pumping capacity, water storages, water demand patterns, preparation of engineering drawings and tender documents for 80 m3/day WTP and other improvement works.
17.      Design and Construction

Supervision of Floating Wash

Centre

Funded by CNRS-OXFAM

2021-22 Chandpur,

Bangladesh

Design of water supply and sanitation

system and a floating vessel for river

boat community in Chandpur along with

Construction supervision and

community engagement.

18.      Feasibility study, design specification, bid documents of Sewerage Treatment Plant (STP) and Sewerage Lines at Rayerbazar (Dhaka) catchment.

Funded by: DOHWA Eng.

2019 Dhaka, Bangladesh Provision of technical support staff to Korean engineering team for preparation of documents and reports in English.
19.      Detailed Design of Sewage Treatment Plant (STP) 

Funded by:  Community Based Medical College (CBMC)

2018 Mymensingh, Bangladesh Detailed design of sewage treatment plant for new hospital building with 1,500 people (50 m3/day STP).
20.      Sewage Treatment Plant Design and Construction Supervision

Funded by: Reza Fashions Ltd.

2017-2018 Gazipur, Bangladesh Investigation of feasible options for onsite wastewater treatment, detailed design of 85m3/day STP.
21.      Drainage Assessment of Dhaka-Narayanganj-Demra Area

Funded by: Esolve R&D Fund

2015 Dhaka, Bangladesh Study of existing drainage system and problems, consultations with local stakeholders, development of hydrologic and hydraulic model, evaluation of options for reducing water logging and recommendation of drainage management strategies.
22.      Low impact Drainage Solution for Resort Development in Bhawal Region

Funded by: Amber Group

2015 Gazipur, Bangladesh The resort is located in the lush setting of Bhawal Forest. Esolve has developed a drainage solution for this 30-acre resort which will be in line with the green surroundings and protect resort from extreme storm events.

Feasibility Studies

 

Sl Project Title Period Region Project Brief
1. Conducting Detail Feasibility
Study and Preparation of
Reports for Development of
Belchura Residential Area
project adjacent to Bangabandhu Tunnel Road,
Anowara, Chattogram
2024 Anwara Upazila,
Chattogram,
Bangladesh
The project will undergo a comprehensive feasibility study, assessing its viability from technical, economic, financial, social, and environmental perspectives to ensure a balanced and beneficial outcome for stakeholder. Environmental Impact Assessment (EIA) will identify and evaluate potential environmental and social impacts, ensuring that development aligns with sustainable practices and minimizes adverse effects on the surrounding ecosystem and community.
2. Technical Study with Design and Landscape Plan for Integrated Development of Goranchatbari Retention Pond in Dhaka City

Funded by: Bangladesh Water Development Board (BWDB)

2023 Dhaka, Bangladesh Collection and review of existing data, maps, information and relevant available study/technical reports, Investigation of DWASA sewerage lines/plans, Identification of point and non-point sources of pollutants in the study area, Primary data collection on water level, discharge
3. Feasibility Study of Water Supply to BSMSN. Funded by: DOHWA Engineering Company Limited 2022 Chandpur and Chittagong,

Bangladesh

Feasibility Study to look at viability of supplying 500 MLD water treatment plant with intake from the Meghna River to BSMSN.
4. Pre-Feasibility Study of Water Supply to BSMSN. Funded by: Taeyoung Engineering & Construction 2022 Chandpur and Chittagong,

Bangladesh

Pre-Feasibility Study to look at viability of supplying 500 MLD water treatment plant with intake from the Meghna River to BSMSN.
5. Topographic Survey for Designing Water Supply Pipeline of Char Patharghata Area.

Funded by: Taeyoung Engineering and Construction

2021 Char Patharghata, Chittagong, Bangladesh Conducting Topographic Survey of the Char Patharghata Area including all structures in a specified buffer zone and RL of Roads. Preparation of survey maps/drawings for pipeline design and survey report.
6. Gandharbpur Water Treatment Plant (WTP) Site and Intake Facility Design

Funded by: Ehsan Khan and Architects Ltd.

2020 Narayanganj, Bangladesh Detailed design of non-process buildings (structural design) and infrastructures (road, drainage, water supply, wastewater, and sewage treatment plant) as well as MEP works (HVAC, plumbing, electrical, fire safety and lightning protection) for Water Treatment Plant Site and Intake Site.
7. Detailed design of Bangabandhu Hi-Tech City 2 Block 6 and Conceptual Design for other Blocks

Funded by: Vitti Sthapati Brindo Ltd.

2020 Gazipur, Bangladesh Detailed design of wet infrastructures in Block 6: stormwater, water supply (incl. 6 MLD WTP), sewer network, treated effluent systems, sewage treatment plants (4 MLD, 1 MLD and 0.4 MLD STP) and sludge management facility. Conceptual design of infrastructure in other six Blocks.
8. Research into Flood Resilience Capacity Building

Funded by: Concern Worldwide

2020 Gaibandha and Lalmonirhat, Bangladesh Flood frequency analyses; Community level capacity building on flood resilience; study of Land use and role of Natural Capital in buffering flood impact, coping with flooding and recovery. Prepare a natural capital management strategy and brochures for communities.
9. Feasibility Study of Waste to Energy Project of Gold Coast Turf Club

Funded by: Sustainable Solutions International Ltd.

2020 Gold Coast, Australia Assess waste input streams, estimate gas generation volumes, evaluate energy production benefits, and conduct financial analyses.
10. Engineering Study of Detention Isolation Centres

Funded by: Intl Committee of the Red Cross (ICRC)

2020 Rajshahi and Kishoreganj Bangladesh Detailed Assessment of the decay of proposed COVID-19 Isolation Centres. Detailed design of proposed improvements. Supervision of contractors during refurbishment works.
11. Topography, road alignment, physical features survey and land acquisition plan for approx. 71km District Road

Funded by: Noor Zaman Engineering Foundation

2019-20 Rangpur, Dinajpur and Gaibandah, Bangladesh Topographical survey and physical feature survey, road cross-section survey, detailed land acquisition plan & earth volume calculation works for 70.6 km of district road in Rangpur Roads and Highways Division
12. Survey and Infrastructure Design of Mirsharai Economic Zone Plot 22

Funded by:  JDI

2019 Mirsarai, Bangladesh Topographic, Ecological and Socio-Economic Surveys and Infrastructure Design of Roads, Water Supply (incl. 23,000 m3/day WTP), Drainage, Wastewater (15,000 m3/day ETP and 7,500 m3/day STP) and Power Systems.
13. Vulnerability Mapping

Funded by: Concern Worldwide

2018 Gaibandha and Lalmonirhat, Bangladesh Collection and analyses of river water levels, topography, and rural settlements. GIS analyses key physical and socio-economic features. Generation of inundation depths. Calculation of statistics and ranking of Upazilas and Unions in terms of vulnerability to flood risks.
14. Survey of Mirsharai Economic Zone Plot 23

Funded by:  JDI/JICA

2018 Mirsarai, Bangladesh Topographic, Bathymetric, Ecological and Socio-Economic Surveys of Mirsharai Economic Zone Plot 23
15. Route Survey, Alternative Analyses and GIS Mapping for Gas Pipeline of Araihazar Economic Zone

Funded by:  JDI/JICA

2018 Narayanganj, Bangladesh Reconnaissance, physical feature, topographic and route survey of gas transmission line from Haripur Power Plant (Bandar) to Araihazar propose economic zone location. Analyses of alternative routes were also undertaken through stakeholder consultations and technical analyses.

Socio-Economic Projects

 

Sl Project Title Period Region Project Brief
Consultancy Services for “Seaweed Cultivation Support and Trainings for DoF” under Project: Integrated Management of the Sundarbans and the Marine Protected Area Swatch of No Ground, Bangladesh (SoNG) 2025 Patuakhali, Barguna, Khulna, Bagerhat Build technical capacity of coastal communities and the Department of Fisheries (DoF) to promote sustainable seaweed cultivation in the south-west coastal region of Bangladesh. Through inception workshops, exposure visits, hands-on training, demonstration plots, and post-harvest processing sessions, the project introduced standardized cultivation techniques, improved farmer skills, and enhanced women’s participation.
1.        A Baseline Study of Community-Based Ecotourism around the Sundarbans

Funded by: Esolve International Limited

2024 Bagerhat, Khulna Determination of Data collection tools, techniques and sample size, subsequent field data collection, Interview and Focus Group Discussion, assessing the challenges and opportunities of developing ecotourism projects around the Sundarbans, Determining Strategies to overcome from the challenges includes waste management programs, community-based ecotourism cooperatives
2.        Upazila Town (Non-Municipal) Master Plan Preparation and Basic Infrastructure Development Project (UTMIDP)

Fund: GoB

2023-25 Cumilla, Sylhet, Kishoreganj, Netrokona Develop a Planning Policy Framework and Guidelines to Ensure Sustainable Development of Atpara Upazila, Mithamoin Upazila, Gowainghat, Lalmai and Monohoarganj. Preparation of Drainage Master Plan, Water Supply Master Plan, Sanitation and Solid Waste Master Plan and Haor Area Master Plan.
3.        Support to create access to public social services for selected slum communities through organizing bi-monthly meetings and establishing registration support booths for climate migrants at the ward councilor’s offices for the project Urban Management of Migration and Livelihood (UMML) / Urban Management of Internal Migration due to Climate Change (UMIMCC)Funded by: GIZ 2023 Khulna, Rajshahi, Sirajganj, Satkhira and Barishal,

Bangladesh

This is an extension and second phase of the 2021-22 project and includes Barishal under this phase. UMIMCC/UMML now aims to intensify and expand the interventions and strengthen the impacts, through:

•Continuous coaching of CDCs on women’s leadership, advocacy, and negotiation skills

• Expanded support at the community level to ensure public social service delivery through bi-monthly meetings at UCD and the community level

• Piloting the establishment of registration support booths for climate migrants at the ward councilor’s office to support them in registration formalities as a prerequisite to access public social services in the partner cities provided through the ‘Information Hubs’

4.        Training on Advocacy and Networking to Community Development under UMIMCC/UMML project

Funded by: GIZ

2023 Barishal, Khulna, Rajshahi, Satkhira and Sirajganj • Conduct Training Need Assessment (TNA),

• Development of training module for 2 days long training on Advocacy and Networking

• Conduct 10 batches of training in five cities (Barishal, Khulna, Rajshahi, Satkhira and Sirajganj),

5.        Planning and Execution of the Development of Business Communication Skills Training 2023 Barishal Conduct Training Need Assessment

• Development of training module for 3 days long training on Business communication skill development

• Conduct 1 batch of training with the government officials of DSS and City Corporation and Municipalities staffs of five cities (Barishal, Khulna, Rajshahi, Satkhira and Sirajganj)

6.        Improve the communication and cooperation between DSS and the CDCs and creating awareness about the access to social services of the selected slum community in all partner cities through organizing bi-monthly meetings for the project Urban Management of Internal Migration due to Climate Change (UMIMCC)

Funded by GIZ

2021-22 Khulna, Rajshahi, Sirajganj and Satkhira, Bangladesh The project aims to train the selected community leaders and raise awareness of the public/government services which are available and how to get access to those services through holding bi-monthly meetings between the government Department of Social Services (DSS) (as service providers) and the Community Development Committees (CDCs) as democratically elected representation of rights holders as well as bi-monthly meetings between CDCs and their respective communities at the community level.

Survey Projects

 

Sl Project Title Period Region Project Brief
1. Survey for Sagorika Eco-Resort, Kuakata 2026 Kuakata, Patuakhali, Bangladesh Conducted detailed site survey and spatial assessment for the proposed Sagorika Eco-Resort development. The assignment included drone-based topographic survey, river cross-section survey, boundary demarcation survey, and plot demarcation survey to develop an accurate geospatial database for project planning and infrastructure development. The survey outputs supported master planning, drainage assessment, utility planning, environmental studies, and future development of resort facilities within the project area.
2. Feasibility Study of Water
Supply to BSMSN.
2022 Chandpur,
Chittagong
Feasibility Study to look at viability of supplying 500 MLD water treatment
plant with intake from the Meghna River to BSMSN. (Preliminary Design and survey of Intake Facilities, Water Treatment Plant, Reservoir, Pumping Station & Tramission Pipeline. Assessment of Water Demand and Social & Environmental Impact Assessment.)
3. Feasibility study, design
specification, bid documents
of Sewerage Treatment Plant
(STP) and Sewerage Lines at
Rayerbazar (Dhaka)
catchment
2019-21 Dhaka Supporting Team Leader with preparation of technical reports in English language Environmental Act & Policy Analysis, Conduct Topographic Survey, Conduct Social & Environmental Base line study, Impact Analysis, Suggest Mitigation Measures, Preparation of Environmental Management Plan, Preparation of Contingency Plan, Preparation of project land use planning, Occupational
health & safety planning, Preparation of Waste management planning, Support Team Leader with preparation of technical reports in English language
4. Topography, road alignment,
physical features survey and
land acquisition plan for
approx. 71km District Road
Funded by: Noor Zaman
Engineering Foundation
2019-20 Rangpur, Dinajpur
and Gaibandah,
Bangladesh
Design option analysis for road alignment. Geometric design of road and intersection for proposed road. Topographical survey and physical feature survey, road cross-section survey, detailed land acquisition plan & earth volume calculation works for 70.6 km of district road in Rangpur Roads and Highways Division
5. Survey of Mirsharai
Economic Zone Plot 23
Funded by: JDI/JICA
2018 Mirsarai,
Bangladesh
Topographic, Bathymetric, Ecological and Socio-Economic Surveys of
Mirsharai Economic Zone Plot 23
6. Survey and Infrastructure
Design of Mirsharai
Economic Zone Plot 22
 2019  Mirsarai,
Bangladesh
Topographic, Ecological and Socioeconomic Surveys and Infrastructure Design of Roads, Water Supply (incl. 23,000 m3/day WTP), Drainage, Wastewater (15,000 m3/day ETP and 7,500 m3/day STP) and Power Systems.
 7. Vulnerability Mapping
Funded by: Concern
Worldwide 
 2018 Gaibandha and Lalmonirhat,
Bangladesh 
Collection and analyses of river water levels, topography, and rural settlements. GIS analyses key physical and socio-economic features. Generation of inundation depths. Calculation of statistics and ranking of Upazilas and Unions in terms of
vulnerability to flood risks. 

Transportation Projects

 

Sl Project Title Period Region Project Brief
1.        Plan & Design for widening the ECT/ICT area road in Hazrat Shahjalal International Airport Client: Civil Aviation Authority Bangladesh/NOCD 2022 Dhaka, Bangladesh Plan & Design for Widening of Existing ECT/ICT area road, detailed design of new internal road, intersection, footpath and parking for cargo vehicle.
2.        Feasibility study for Replacement of dilapidated and narrow Bailey Bridges at important points- “Chittagong Zone”

Client: Roads and Highways Department (RHD)/IIFC

2022 Bandarban, Khakrachari, and Rangamati, Bangladesh Condition Assessment of the existing Bridges. Conducting Traffic survey, Topographic survey and Sub-soil investigation of existing bridges. Architectural and detailed structural design of large 10-nos bridges
3.        Topography, road alignment, physical features survey and land acquisition plan for approx. 39.7 km District Road

Client: Noor RHD/Noor Zaman Engineering Foundation

2020-21 Cumilla and Brahmanbaria, Bangladesh Design option analysis for road alignment. Geometric design of road and intersection for proposed road.  Topographical survey and physical feature survey, road cross-section survey, detailed land acquisition plan & earth volume calculation works for 39.7 km of district road in Cumilla and Brahmanbaria Roads and Highways Division
4.        Topography, road alignment, physical features survey and land acquisition plan for approx. 17.0 km District Road

Client: RHD/Noor Zaman Engineering Foundation

2020-21 Manikganj, Bangladesh Design option analysis for road alignment. Geometric design of road and intersection for proposed road.  Topographical survey and physical feature survey, road cross-section survey, detailed land acquisition plan & earth volume calculation works for 17.0 km of district road in Manikganj Roads and Highways Division
5. Gandharbpur Water Treatment Plant (WTP) Site and Intake Facility Design

Client: Dhaka Water Supply and Sewerage Authority (DWASA)/Ehsan Khan and Architects Ltd.

 2020  Narayanganj, Bangladesh  Detailed design of road network for Water Treatment Plant Site and Intake Site.
6.        Detailed design of Bangabandhu Hi-Tech City 2 Block 6 and Conceptual Design for other Blocks

Client: Bangladesh Hi-Tech Park Authority (BHTPA)/Vitti Sthapati Brindo Ltd.

2020 Gazipur, Bangladesh Detailed design of wet infrastructures in Block 6: Roads stormwater, water supply (incl. 6 MLD WTP), sewer network, treated effluent systems, sewage treatment plants (4 MLD, 1 MLD and 0.4 MLD STP) and sludge management facility. Conceptual design of infrastructure in other six Blocks.
7.        Topography, road alignment, physical features survey and land acquisition plan for approx. 71km District Road

Client: RHD/Zaman Engineering Foundation

2019-20 Rangpur, Dinajpur and Gaibandah, Bangladesh Design option analysis for road alignment. Geometric design of road and intersection for proposed road.  Topographical survey and physical feature survey, road cross-section survey, detailed land acquisition plan & earth volume calculation works for 70.6 km of district road in Rangpur Roads and Highways Division
8.        Survey and Infrastructure Design of Mirsharai Economic Zone Plot 22

Client: BEZA/JDI

2019 Mirsarai, Bangladesh Road network Design, Design of Roundabout, Topographic, Ecological and Socio-Economic Surveys and Infrastructure Design for Water Supply (incl. 23,000 m3/day WTP),