Water Supply Projects
Sl | Project Title | Period | Region | Project Brief |
1. | Consultant Services for Detailed Engineering Design & Construction Supervision of Water Supply and Integrated Waste Management | 2024 | Tungipara, Gopalganj, Bangladesh | Data Collection and review of existing water supply, Review and updating population projection and future water demand, detail engineering design, drawing and technical specification of water supply components, preparation of detail engineering drawing and construction design of integrated waste management system |
2. | Consultancy of MEP Design and drawing for the grand | 2023 | Rajendrapur, Gazipur | Design of Storm Water & Sewerage Management System, Water Supply & Fire hydrant System and Utility Duct |
3. | Feasibility and functionality assessment for rural piped water schemes and other alternative technologies under technical assistance to DPHE for strengthening institutional systems and arsenic mitigation initiatives in selected upazilas of Bangladesh. Funded by: UNICEF | 2022 | 17 districts of Bangladesh | The purpose of this assignment is to conduct feasibility assessments for new rural piped water schemes, prepare context specific design and cost estimates, and to conduct technical assessment of existing non-functional water systems (PWSS/ MAR/ PSF) with recommendations and cost estimates for full repair, rehabilitation, improvement, and O&M system development. |
4. | Catchment Water Assessment
Funded by: AWS |
2023 | Narayangonj & Gazipur,
Bangladesh |
Assessment of the catchment of the study area & engagement of the Stakeholders |
5. | Urban Infrastructure Improvement Preparatory Facility
Funded By: NJS/DPHE/ADB |
2021 | Rangamati, Bandarban, Lama, Cumilla, Natore, Pabna & Ishwardi,
Bangladesh |
Feasibility Study and Hydraulic Modelling of the existing and new water supply network of the hill towns (Rangamati, Bandarban & Lama). Situation Analysis, Feasibility study and Hydraulic Modelling of Cumilla and Ishwardi Cluster. |
6. | Water Supply Network Design for Purbachal New Town
Funded by: Rajuk / IWM |
2021 | Purbachal, Dhaka, Bangladesh | Design and Construction Supervision of Water Supply and Distribution Facilities at Purbachal New Town |
7. | Topographic Survey for Designing Water Supply Pipeline of Char Patharghata Area.
Funded by: Taeyoung Engineering and Construction |
2021 | Char Patharghata, Chittagong, Bangladesh | Conducting Topographic Survey of the Char Patharghata Area including all structures in a specified buffer zone and RL of Roads. Preparation of survey maps/drawings for pipeline design and survey report. |
8. | Training on Water Supply Network Design
Funded by: IEB |
2021 | Dhaka, Bangladesh | Training of Engineering Professionals on planning, design, and maintenance of water supply networks in an urban area. |
9. | Water Demand Survey
Funded by: Taeyoung Engineering and Construction |
2020 | Chattogram, Bangladesh | Conduct survey of 12 nos. sites: built-up areas, commercial sites, institutions, and industries. Estimate current and future (2041) water demands. |
10. | Gandharbpur Water Treatment Plant (WTP) Site and Intake Facility Design
Funded by: Ehsan Khan and Architects Ltd. |
2020 | Narayanganj, Bangladesh | Detailed design of non-process buildings (structural design) and infrastructures (road, drainage, water supply, wastewater, and sewage treatment plant) as well as MEP works (HVAC, plumbing, electrical, fire safety and lightning protection) for Water Treatment Plant Site and Intake Site. |
11. | Detailed design of Bangabandhu Hi-Tech City 2 Block 6 and Conceptual Design for other Blocks
Funded by: Vitti Sthapati Brindo Ltd. |
2020 | Gazipur, Bangladesh | Detailed design of wet infrastructures in Block 6: stormwater, water supply (incl. 6 MLD WTP), sewer network, treated effluent systems, sewage treatment plants (4 MLD, 1 MLD and 0.4 MLD STP) and sludge management facility. Conceptual design of infrastructure in other six Blocks. |
12. | Construction supervision and monitoring of rural piped water systems under the Arsenic Safe Union Project.
Funded by: UNICEF |
2020 | Sylhet and Cumilla Districts of Bangladesh | Supervise construction and develop O&M modalities for 6 nos. water supply schemes including water treatment plants (WTPs) as well as 19 nos. arsenic-iron removal plants (In association with EIMS) |
13. | Hydrologic Assessment of Modhur Charrha
Funded by: CNRS |
2019 | Cox’s Bazar, Bangladesh | Study of stream order, hydrologic drivers, pollution sources as well as GIS Mapping and contribute to Watershed Restoration Plan for UNHCR. |
14. | Design of Water Distribution Network
Funded by: Neptune Land Dev. Ltd. (United Group) |
2019 | Dhaka, Bangladesh | Survey and design of water supply pipe network with associated facilities for United City, which is a 137-acre private mixed residential development project. |
15. | Survey and Infrastructure Design of Mirsharai Economic Zone Plot 22
Funded by: JDI |
2019 | Mirsarai, Bangladesh | Topographic, Ecological and Socio-Economic Surveys and Infrastructure Design of Roads, Water Supply (incl. 23,000 m3/day WTP), Drainage, Wastewater (15,000 m3/day ETP and 7,500 m3/day STP) and Power Systems. |
16. | Consultancy service for rural piped water system design under the Arsenic Safe Union Project.
Funded by: UNICEF |
2019 | Sylhet, Cumilla and Satkhira Districts of Bangladesh | Feasibility assessment of proposed sites, identification of water sources, outline, and detailed design of climate resilient water supply scheme in rural areas (including WTPs). Prepare tender documents. |
17. | Technical Assessment of Water Supply System of Cox’s Bazar Sadar Hospital
Funded by: International Committee of the Red Cross (ICRC) |
2019 | Cox’s Bazar, Bangladesh | Testing of water quality, assessment of borewell hydrogeology and pumping capacity, inspection of reservoir condition, identification of internal and external plumbing, water treatment plant (WTP) design, preparation of engineering drawings and tender documents for improvement works. |
18. | NRLX Site Storm Water Modelling
Funded by: Sustainable Solutions International |
2018 | Queensland, Australia | Development of storm water (SWMM) and treatment (MUSIC) models for NRLX site. Evaluation of different storm water management options. |
19. | Vulnerability Mapping
Funded by: Concern Worldwide |
2018 | Gaibandha and Lalmonirhat, Bangladesh | Collection and analyses of river water levels, topography, and rural settlements. GIS analyses key physical and socio-economic features. Generation of inundation depths. Calculation of statistics and ranking of Upazilas and Unions in terms of vulnerability to flood risks. |
20. | Water Supply System Audit
Funded by: Reza Fashions Ltd. |
2018 | Gazipur, Bangladesh | Investigation of water source arrangement, storage facilities, plumbing system, and water quality. Recommendations for improving on-site water use efficiency. Development of a monitoring system to track water consumption throughout the building. |
21. | Water Supply and Drainage System Survey, Mapping, Modelling and Design
Funded by: Water & Life, Bangladesh |
2017-2018 | Dhaka and Chittagong, Bangladesh | Infrastructure, topographic, water supply and drainage system survey. Development of DEM, hydrologic and hydraulic network models. Analyses of future scenarios (water demand, wastewater, and stormwater runoff). Detailed design of water supply (incl. WTP) and drainage systems. Approval from relevant authorities (DWASA & CWASA). |
22. | National Water Balance System Project – Muda River Basin Design
Funded by: Dept. of Irrigation and Drainage |
2016-2018 | Kedah and Penang, Malaysia | Conducting five studies: Water Balance, Demand Management, Environmental Flow, Water Resources Conservation Plan and Water-Energy-Food Nexus. Production of GIS maps. Stakeholder consultations at local and State level. Support to modelling team developing Decision Making Support System (DMSS). |
23. | Rupayan Town Wet Infrastructure Design
Funded by: Rupayan Housing Estate Ltd. |
2017-2018 | Narayanganj, Bangladesh | Assessment of water demands and design of water supply network (incl. 205 m3/day WTP). Assessment of wastewater generation rates and design of sewerage pipes and sewerage treatment plant (160 m3/day STP). Hydrologic analyses and drainage system design. |
24. | BESTWAY Group Land Development Project
Funded by: Bestway Group |
2013 – 2014 | Dhaka, Bangladesh | Design of water distribution system (incl. WTP) for land development project using hydraulic modelling. Future demand was estimated for design purposes which included domestic, commercial, and other facilities. A GIS database was developed for land use distribution. Sources of water supply were also identified. Plan and profile drawings for construction were prepared. |
Environmental Projects
Sl | Project Title | Period | Region | Project Brief |
1. | National Consultancy Support for Investment Identification and Scoping under Dhaka River Restoration – Umbrella Investment Program (UIP) | 2024 | Narayanganj, Savar, | (1) Rapid sector diagnostics for priority sectors (wastewater, solid waste, industrial effluent and other pollution sources, urban development , river front, canal rehabilitation, river flow management, flood management and drainage, water borne transportation and linked mobility/transport infrastructure), (2) Investment identification and screening for risks, impacts and implementation readiness, and (3) Prioritization and scoping of investments with indicative cost estimates. |
2. | Environmental Impact Assessment (EIA) for 1000 MW Solar Power Plant in Char Harirampur of Faridpur District | 2023 | Char Harirampur, Char Bhadrasan Upazila, Faridpur, Dhaka | A detailed report on the Environmental Impact Assessment (EIA) with policy and regulatory framework, assess baseline conditions, screen environmental impacts, identify mitigation measures, analyze alternatives, and develop reports and an Environmental Management Plan to obtain project approval, focusing on addressing environmental concerns throughout the project lifecycle. |
3. | Environmental & Social Impact Assessment and Preparation on an Environmental and Social Management Framework for Pilot Non-Network Sanitation System in Chattogram City
Funded by: Waste Concern |
2023 | Chittagong,
Bangladesh |
Preparation of ESIA and ESMF as per World Bank Environmental and Social Framework for proposed non-network sanitation interventions for CWASA. |
4. | Environmental Impact Assessment for Jatra Osiris Data Center.
Funded by JATRA/Vitti Sthapati Brindo Ltd. |
2023 | Gazipur,
Bangladesh |
Environmental Impact Assessment of a Data Center Infrastructure in Bangabandhu Hi-Tech City (Block 6). Review of development activities, policies, laws and regulations, baseline survey, impact identification and evaluation, Environmental Management Plan (EMP) preparation, community consultations and obtain ECC from DoE |
5. | Climate Change & Environmental Impact Assessment (EIA) under Restoration of Water bodies for Sustainable Water
Management in Dhaka Watershed. Funded by: IWM/DWASA |
2022 | Dhaka,
Bangladesh |
Study to perform a detailed analysis to identify the potential environmental and climate change related vulnerabilities associated with the proposed restoration measures of the water bodies. |
6. | Environmental Impact Assessment for BSMSN Sheikh Hasina Sharobar. Funded by: BEZA/Vitti Sthapati Brindo Ltd. | 2022 | Mirsarai,
Chattogram, Bangladesh |
Baseline survey and assessment, identification of potential project impacts, development of environmental management plan with budget and implementation arrangements. |
7. | ToT of Environmental, Climate Change & Disaster Risk Reduction Awareness Program
Funded by: FIDA International |
2022 | Dhaka, Bangladesh | FIDA is an international NGO where they support several primary schools. This project was initiated to increase environmental, climate change and disaster awareness amongst the school and the surrounding community. |
8. | Environmental Impact Assessment (EIA) and field surveys under BWDB Project
Funded by: IWM/DWASA |
2022 | Shariatpur, Bangladesh | EIA study and Pertinent field surveys for Protection of Char Tarabunia area from Right Bank Erosion of the Padma River |
9. | Hydro-Morphological Study and EIA of Bridges
Funded by: RHD / IWM |
2022 | Narayangonj, Bangladesh | Environmental Impact Assessment of proposed 2 nos. bridges at Meghna.
Economic Zone connecting road and with approach road at Cumilla. Economic Zone connecting road |
10. | Hydro-Morphological Study and EIA of Bridges
Funded by: RHD / IWM |
2021 | Pabna, Bangladesh | Environmental Impact Assessment of proposed 2 nos. bridges (Naradaha and Khaschar). Baseline survey, impact identification and evaluation, Environmental Management Plan (EMP) preparation, EMP Budget and community consultations. |
11. | Hydro-Morphological Study and EIA of Bridges
Funded by: RHD / IWM |
2021 | Munshigonj, Bangladesh | Environmental Impact Assessment of proposed Kunderbazar Bridge. Baseline survey, impact identification and evaluation, Environmental Management Plan (EMP) preparation, EMP Budget and community consultations. |
12. | Updating of ESIA of Araihazar EZ
Funded by: BEZA/IWM |
2021 | Narayanganj, Bangladesh | Environmental Social Impact Assessment of Economic Zone, including gas transmission pipeline and power plant. Baseline survey, impact identification and evaluation, Environmental and Social Management Plan (ESMP) preparation, ESMP Budget and stakeholder consultations. |
13. | EIA of ORYX Biotech Pty Ltd.
Funded by: ORYX/Vitti Sthapati Brindo Ltd. |
2021 | Gazipur, Bangladesh | Environmental Social Impact Assessment of Plasma Fractionation Plant in Bangabandhu Hi-Tech City (Block 2). Baseline survey, impact identification and evaluation, Environmental Management Plan (EMP) preparation, EMP Budget and community consultations. |
14. | Consultancy services to prepare a Training Manual on
Environmental & Social Management Framework (ESMF) Funded by ITN-BUET |
2021 | Cox’s Bazar, Bangladesh | Development of a comprehensive ‘Training Manual’ on ESMF for capacity building training for communities and selected government officials. |
15. | EIA of Bridges
Funded by: RHD / IWM |
2021 | Moulvibazar, Bangladesh | Environmental Impact Assessment of proposed 2 nos. bridges (Kushiara & Monu) for Roads and Highways Department. Baseline survey, impact identification and evaluation, Environmental Management Plan (EMP) preparation, EMP Budget and community consultations. |
16. | EIA of Bridges
Funded by: RHD / IWM |
2020 | Feni, Narial, Netrokona and Mymensingh, Bangladesh | Environmental Impact Assessment of proposed 8 nos. bridges for Roads and Highways Department. Baseline survey, impact identification and evaluation, Environmental Management Plan (EMP) preparation, EMP Budget and community consultations. |
17. | Preparation of Environmental Management Framework
Funded by: Danish Refugee Council |
2020 | Cox’s Bazar, Bangladesh | Analyses of environmental impacts of livelihood programme, conduct ESIA of waste management projects, Development Environmental Management Framework, prepare compliance Action pan, prepare Environmental Monitoring Plan, and conduct stakeholder consultations. |
18. | Topography, road alignment, physical features survey and land acquisition plan for approx. 71km District Road
Funded by: Noor Zaman Engineering Foundation |
2019-20 | Rangpur, Dinajpur and Gaibandah, Bangladesh | Topographical survey and physical feature survey, road cross-section survey, detailed land acquisition plan & earth volume calculation works for 70.6 km of district road in Rangpur Roads and Highways Division |
19. | Development of Environmental Monitoring Programme (EMP)
Funded by: Sustainable Solutions International |
2019 | Queensland, Australia | Development of macros and coding in MS Excel to store and display environmental monitoring data for a site with sewage treatment plant and irrigation of treated wastewater. |
20. | EIA of Bridges
Funded by: RHD / IWM |
2019 | Kishoreganj, Bangladesh | Environmental Impact Assessment of proposed 2 nos. bridges for Roads and Highways Department. Baseline survey, impact identification and evaluation, Environmental Management Plan (EMP) preparation, EMP Budget and community consultations. |
21. | EIA of Bridges
Funded by: RHD / IWM |
2018 | Shariatpur, Bangladesh | Environmental Impact Assessment of proposed 3 nos. bridges for Roads and Highways Department. Baseline survey, impact identification and evaluation, Environmental Management Plan (EMP) preparation, EMP Budget and community consultations. |
22. | Environmental Study of Sonargaon Art & Craft Museum Complex Ponds
Funded by: Young One Corporation |
2017 | Sonargaon, Narayanganj,
Bangladesh |
Identify potential pollution sources of Sonargaon Sites and Feasibility Study of pond treatment options. |
Sewer Projects
Sl | Project Title | Period | Region | Project Brief |
1. | Supply of Design, drawings and technical support for STP
Funded by: Community Based Medical College Bangladesh (CBMCB) |
2024 | Churkhai, Mymensingh, Bangladesh | Evaluation of existing sewage infrastructure and client requirements, Identification of regulatory standards and environmental factors, Developing preliminary STP design concepts, preparation of comprehensive engineering drawings and specifications. |
2. | Faecal Sludge Management and Onsite Sanitation Improvements for PESSCM-1/W2 Funded by: JV of Zhongnan Engineering Corporation Ltd and Sinohydro Corporation Ltd | 2024 | North Agrabad, Chittagong, Bangladesh | Design of collection, and transport model for faecal sludge; Enhancing efficiency and effectiveness of FSM strategies, Develop vehicle configuration for effective transport of faecal sludge, Prepare and identify site specific detailed design solutions for existing and new toilets |
3. | Design for Sewerage Network
Funded by: JV of Zhongnan Engineering Corporation Ltd and Sinohydro Corporation Ltd |
2023 | North Agrabad, Chittagong, Bangladesh | Design for Sewerage Network of CWASA Catchment 1, W2 Package of 50 kilometer for a 100 MLD Sewage Treatment Plant |
4. | Design for Sewerage Network
Funded by: China Civil Engineering Construction Corporation Ltd. (CCECC) |
2022 | Agrabad, Chittagong, Bangladesh | Design for Sewerage Network of CWASA Catchment 1, W3 Package of 50 kilometer for a 100 MLD Sewage Treatment Plant |
5. | Design for Sewerage Network
Funded by: Taeyoung Engineering & Construction |
2022 | Halishar, Chittagong, Bangladesh | Design for Sewerage Network of CWASA Catchment 1, W1 Package of 90 kilometer for a 100 MLD Sewage Treatment Plant |
6. | Design Drainage System to Eliminate Waterlogging on Dhaka Mymensingh Highway
Funded by: Dhaka North City Corporation |
Dhaka,
Bangladesh |
Conduct study to improve the drainage system of Dhaka Mymensingh Road near Uttara Model Town and Hazrat Shahjalal International Airport | |
7. | Tender Preparation Support Service for DWASA WD5 A & WD5 B
Funded by: Stecol Corporation |
2023 | Dhaka,
Bangladesh |
Professional and experienced designing entity capable of performing the works within the scope specified herein and is willing to provide technical support during the tender stage. |
8. | CAAB Residential Area Drainage and STP Design. Funded by: Civil Aviation Authority Bangladesh/NOCD | 2022 | Dhaka, Bangladesh | Update/Modification of the Existing Drainage System design and STP solution for CAAB Residential Area of 1 SqKm. |
9. | Update/Modification of the Existing Wet Infrastructure for Hazrat Shah Jalal International Airport.
Funded by: Civil Aviation Authority Bangladesh/NOCD |
2022 | Dhaka, Bangladesh | Assessment of the existing Water, Drainage and Sewerage System of the entire airport area under Terminal 1, 2 and Domestic Terminal and provide recommendation for update and modification with detailed design. |
10. | Supervision work for drainage cleaning of HSIA. Funded by Civil Aviation Authority Bangladesh/NOCD | 2022 | Dhaka, Bangladesh | Drainage Cleaning Supervision Work for Hazrat Shahjalal International Airport of the entire drainage network and the outfalls. |
11. | Solid Waste Audit and Feasibility Study of Waste to Energy Project of Brisbane Market
Funded by: Sustainable Solutions International Ltd. |
2020 | Brisbane, Australia | Conduct audit of waste input streams, estimate gas generation volumes, evaluate energy production benefits, and conduct financial analyses for different scenarios. |
12. | Wastewater Treatment Plant (ETP) Design for Gas Exploration Site
Funded by: CNRS |
2020 | Maheshkhali, Bangladesh | 4.2 m3/day wastewater treatment plant (ETP) design and construction supervision for safe disposal of slurry from gas exploration site. |
13. | Technical Assessment of Water Supply and Drainage System of Cox’s Bazar Sadar District Jail
Funded by: Intl Committee of the Red Cross (ICRC) |
2020 | Cox’s Bazar, Bangladesh | Testing of water quality, assessment of borewell hydrogeology and pumping capacity, water storages, water demand patterns, preparation of engineering drawings and tender documents for 80 m3/day WTP and other improvement works. |
14. | Design and Construction
Supervision of Floating Wash Centre Funded by CNRS-OXFAM |
2021-22 | Chandpur,
Bangladesh |
Design of water supply and sanitation
system and a floating vessel for river boat community in Chandpur along with Construction supervision and community engagement. |
15. | Feasibility study, design specification, bid documents of Sewerage Treatment Plant (STP) and Sewerage Lines at Rayerbazar (Dhaka) catchment.
Funded by: DOHWA Eng. |
2019 | Dhaka, Bangladesh | Provision of technical support staff to Korean engineering team for preparation of documents and reports in English. |
16. | Detailed Design of Sewage Treatment Plant (STP)
Funded by: Community Based Medical College (CBMC) |
2018 | Mymensingh, Bangladesh | Detailed design of sewage treatment plant for new hospital building with 1,500 people (50 m3/day STP). |
17. | Sewage Treatment Plant Design and Construction Supervision
Funded by: Reza Fashions Ltd. |
2017-2018 | Gazipur, Bangladesh | Investigation of feasible options for onsite wastewater treatment, detailed design of 85m3/day STP. |
18. | Drainage Assessment of Dhaka-Narayanganj-Demra Area
Funded by: Esolve R&D Fund |
2015 | Dhaka, Bangladesh | Study of existing drainage system and problems, consultations with local stakeholders, development of hydrologic and hydraulic model, evaluation of options for reducing water logging and recommendation of drainage management strategies. |
19. | Low impact Drainage Solution for Resort Development in Bhawal Region
Funded by: Amber Group |
2015 | Gazipur, Bangladesh | The resort is located in the lush setting of Bhawal Forest. Esolve has developed a drainage solution for this 30-acre resort which will be in line with the green surroundings and protect resort from extreme storm events. |
Transportation Projects
Sl | Project Title | Period | Region | Project Brief | |
1. | Plan & Design for widening the ECT/ICT area road in Hazrat Shahjalal International Airport Funded by: Civil Aviation Authority Bangladesh/NOCD | 2022 | Dhaka, Bangladesh | Plan & Design for Widening of Existing ECT/ICT area road, detailed design of new internal road, intersection, footpath and parking for cargo vehicle. | |
2. | Feasibility study for Replacement of dilapidated and narrow Bailey Bridges at important points- “Chittagong Zone”
Funded by: Ministry of Road Transport and Bridges/IIFC |
2022 | Bandarban, Khakrachari, and Rangamati, Bangladesh | Condition Assessment of the existing Bridges. Conducting Traffic survey, Topographic survey and Sub-soil investigation of existing bridges. Architectural and detailed structural design of large 10-nos bridges | |
3. | Topography, road alignment, physical features survey and land acquisition plan for approx. 39.7 km District Road
Funded by: Noor Zaman Engineering Foundation/RHD |
2020-21 | Cumilla and Brahmanbaria, Bangladesh | Design option analysis for road alignment. Geometric design of road and intersection for proposed road. Topographical survey and physical feature survey, road cross-section survey, detailed land acquisition plan & earth volume calculation works for 39.7 km of district road in Cumilla and Brahmanbaria Roads and Highways Division | |
4. | Topography, road alignment, physical features survey and land acquisition plan for approx. 17.0 km District Road
Funded by: Noor Zaman Engineering Foundation/RHD |
2020-21 | Manikganj, Bangladesh | Design option analysis for road alignment. Geometric design of road and intersection for proposed road. Topographical survey and physical feature survey, road cross-section survey, detailed land acquisition plan & earth volume calculation works for 17.0 km of district road in Manikganj Roads and Highways Division | |
5. | Gandharbpur Water Treatment Plant (WTP) Site and Intake Facility Design
Funded by: Ehsan Khan and Architects Ltd. |
2020 | Narayanganj, Bangladesh | Detailed design of road network for Water Treatment Plant Site and Intake Site. | |
6. | Detailed design of Bangabandhu Hi-Tech City 2 Block 6 and Conceptual Design for other Blocks
Funded by: Vitti Sthapati Brindo Ltd. |
2020 | Gazipur, Bangladesh | Detailed design of wet infrastructures in Block 6: Roads stormwater, water supply (incl. 6 MLD WTP), sewer network, treated effluent systems, sewage treatment plants (4 MLD, 1 MLD and 0.4 MLD STP) and sludge management facility. Conceptual design of infrastructure in other six Blocks. | |
7. | Topography, road alignment, physical features survey and land acquisition plan for approx. 71km District Road
Funded by: Noor Zaman Engineering Foundation |
2019-20 | Rangpur, Dinajpur and Gaibandah, Bangladesh | Design option analysis for road alignment. Geometric design of road and intersection for proposed road. Topographical survey and physical feature survey, road cross-section survey, detailed land acquisition plan & earth volume calculation works for 70.6 km of district road in Rangpur Roads and Highways Division | |
8. | Survey and Infrastructure Design of Mirsharai Economic Zone Plot 22
Funded by: JDI |
2019 | Mirsarai, Bangladesh | Road network Design, Design of Roundabout, Topographic, Ecological and Socio-Economic Surveys and Infrastructure Design for Water Supply (incl. 23,000 m3/day WTP), |
Feasibility Studies
Sl | Project Title | Period | Region | Project Brief | |
1. | Technical Study with Design and Landscape Plan for Integrated Development of Goranchatbari Retention Pond in Dhaka City
Funded by: Bangladesh Water Development Board (BWDB) |
2023 | Dhaka, Bangladesh | Collection and review of existing data, maps, information and relevant available study/technical reports, Investigation of DWASA sewerage lines/plans, Identification of point and non-point sources of pollutants in the study area, Primary data collection on water level, discharge | |
2. | Feasibility Study of Water Supply to BSMSN. Funded by: DOHWA Engineering Company Limited | 2022 | Chandpur and Chittagong,
Bangladesh |
Feasibility Study to look at viability of supplying 500 MLD water treatment plant with intake from the Meghna River to BSMSN. | |
3. | Pre-Feasibility Study of Water Supply to BSMSN. Funded by: Taeyoung Engineering & Construction | 2022 | Chandpur and Chittagong,
Bangladesh |
Pre-Feasibility Study to look at viability of supplying 500 MLD water treatment plant with intake from the Meghna River to BSMSN. | |
4. | Topographic Survey for Designing Water Supply Pipeline of Char Patharghata Area.
Funded by: Taeyoung Engineering and Construction |
2021 | Char Patharghata, Chittagong, Bangladesh | Conducting Topographic Survey of the Char Patharghata Area including all structures in a specified buffer zone and RL of Roads. Preparation of survey maps/drawings for pipeline design and survey report. | |
5. | Topography, road alignment, physical features survey and land acquisition plan for approx. 39.7 km District Road
Funded by: Noor Zaman Engineering Foundation/RHD |
2020-21 | Cumilla and Brahmanbaria, Bangladesh | Topographical survey and physical feature survey, road cross-section survey, detailed land acquisition plan & earth volume calculation works for 39.7 km of district road in Cumilla and Brahmanbaria Roads and Highways Division | |
6. | Topography, road alignment, physical features survey and land acquisition plan for approx. 17.0 km District Road
Funded by: Noor Zaman Engineering Foundation/RHD |
2020-21 | Manikganj, Bangladesh | Topographical survey and physical feature survey, road cross-section survey, detailed land acquisition plan & earth volume calculation works for 17.0 km of district road in Manikganj Roads and Highways Division | |
7. | Gandharbpur Water Treatment Plant (WTP) Site and Intake Facility Design
Funded by: Ehsan Khan and Architects Ltd. |
2020 | Narayanganj, Bangladesh | Detailed design of non-process buildings (structural design) and infrastructures (road, drainage, water supply, wastewater, and sewage treatment plant) as well as MEP works (HVAC, plumbing, electrical, fire safety and lightning protection) for Water Treatment Plant Site and Intake Site. | |
8. | Detailed design of Bangabandhu Hi-Tech City 2 Block 6 and Conceptual Design for other Blocks
Funded by: Vitti Sthapati Brindo Ltd. |
2020 | Gazipur, Bangladesh | Detailed design of wet infrastructures in Block 6: stormwater, water supply (incl. 6 MLD WTP), sewer network, treated effluent systems, sewage treatment plants (4 MLD, 1 MLD and 0.4 MLD STP) and sludge management facility. Conceptual design of infrastructure in other six Blocks. | |
9. | Research into Flood Resilience Capacity Building
Funded by: Concern Worldwide |
2020 | Gaibandha and Lalmonirhat, Bangladesh | Flood frequency analyses; Community level capacity building on flood resilience; study of Land use and role of Natural Capital in buffering flood impact, coping with flooding and recovery. Prepare a natural capital management strategy and brochures for communities. | |
10. | Feasibility Study of Waste to Energy Project of Gold Coast Turf Club
Funded by: Sustainable Solutions International Ltd. |
2020 | Gold Coast, Australia | Assess waste input streams, estimate gas generation volumes, evaluate energy production benefits, and conduct financial analyses. | |
11. | Engineering Study of Detention Isolation Centres
Funded by: Intl Committee of the Red Cross (ICRC) |
2020 | Rajshahi and Kishoreganj Bangladesh | Detailed Assessment of the decay of proposed COVID-19 Isolation Centres. Detailed design of proposed improvements. Supervision of contractors during refurbishment works. | |
12. | Topography, road alignment, physical features survey and land acquisition plan for approx. 71km District Road
Funded by: Noor Zaman Engineering Foundation |
2019-20 | Rangpur, Dinajpur and Gaibandah, Bangladesh | Topographical survey and physical feature survey, road cross-section survey, detailed land acquisition plan & earth volume calculation works for 70.6 km of district road in Rangpur Roads and Highways Division | |
13. | Survey and Infrastructure Design of Mirsharai Economic Zone Plot 22
Funded by: JDI |
2019 | Mirsarai, Bangladesh | Topographic, Ecological and Socio-Economic Surveys and Infrastructure Design of Roads, Water Supply (incl. 23,000 m3/day WTP), Drainage, Wastewater (15,000 m3/day ETP and 7,500 m3/day STP) and Power Systems. | |
14. | Vulnerability Mapping
Funded by: Concern Worldwide |
2018 | Gaibandha and Lalmonirhat, Bangladesh | Collection and analyses of river water levels, topography, and rural settlements. GIS analyses key physical and socio-economic features. Generation of inundation depths. Calculation of statistics and ranking of Upazilas and Unions in terms of vulnerability to flood risks. | |
15. | Survey of Mirsharai Economic Zone Plot 23
Funded by: JDI/JICA |
2018 | Mirsarai, Bangladesh | Topographic, Bathymetric, Ecological and Socio-Economic Surveys of Mirsharai Economic Zone Plot 23 | |
16. | Route Survey, Alternative Analyses and GIS Mapping for Gas Pipeline of Araihazar Economic Zone
Funded by: JDI/JICA |
2018 | Narayanganj, Bangladesh | Reconnaissance, physical feature, topographic and route survey of gas transmission line from Haripur Power Plant (Bandar) to Araihazar propose economic zone location. Analyses of alternative routes were also undertaken through stakeholder consultations and technical analyses. |
Socio-Economic Projects
Sl | Project Title | Period | Region | Project Brief |
1. | A Baseline Study of Community-Based Ecotourism around the Sundarbans
Funded by: Esolve International Limited |
2024 | Bagerhat, Khulna | Determination of Data collection tools, techniques and sample size, subsequent field data collection, Interview and Focus Group Discussion, assessing the challenges and opportunities of developing ecotourism projects around the Sundarbans, Determining Strategies to overcome from the challenges includes waste management programs, community-based ecotourism cooperatives |
2. | Upazila Town (Non-Municipal) Master Plan Preparation and Basic Infrastructure Development Project (UTMIDP)
Fund: GoB |
2023-25 | Cumilla, Sylhet, Kishoreganj, Netrokona | Develop a Planning Policy Framework and Guidelines to Ensure Sustainable Development of Atpara Upazila, Mithamoin Upazila, Gowainghat, Lalmai and Monohoarganj. Preparation of Drainage Master Plan, Water Supply Master Plan, Sanitation and Solid Waste Master Plan and Haor Area Master Plan. |
3. | Support to create access to public social services for selected slum communities through organizing bi-monthly meetings and establishing registration support booths for climate migrants at the ward councilor’s offices for the project Urban Management of Migration and Livelihood (UMML) / Urban Management of Internal Migration due to Climate Change (UMIMCC)Funded by: GIZ | 2023 | Khulna, Rajshahi, Sirajganj, Satkhira and Barishal,
Bangladesh |
This is an extension and second phase of the 2021-22 project and includes Barishal under this phase. UMIMCC/UMML now aims to intensify and expand the interventions and strengthen the impacts, through:
•Continuous coaching of CDCs on women’s leadership, advocacy, and negotiation skills • Expanded support at the community level to ensure public social service delivery through bi-monthly meetings at UCD and the community level • Piloting the establishment of registration support booths for climate migrants at the ward councilor’s office to support them in registration formalities as a prerequisite to access public social services in the partner cities provided through the ‘Information Hubs’ |
4. | Training on Advocacy and Networking to Community Development under UMIMCC/UMML project
Funded by: GIZ |
2023 | Barishal, Khulna, Rajshahi, Satkhira and Sirajganj | • Conduct Training Need Assessment (TNA),
• Development of training module for 2 days long training on Advocacy and Networking • Conduct 10 batches of training in five cities (Barishal, Khulna, Rajshahi, Satkhira and Sirajganj), |
5. | Planning and Execution of the Development of Business Communication Skills Training | 2023 | Barishal | Conduct Training Need Assessment
• Development of training module for 3 days long training on Business communication skill development • Conduct 1 batch of training with the government officials of DSS and City Corporation and Municipalities staffs of five cities (Barishal, Khulna, Rajshahi, Satkhira and Sirajganj) |
6. | Improve the communication and cooperation between DSS and the CDCs and creating awareness about the access to social services of the selected slum community in all partner cities through organizing bi-monthly meetings for the project Urban Management of Internal
Migration due to Climate Change (UMIMCC) Funded by GIZ |
2021-22 | Khulna, Rajshahi, Sirajganj and Satkhira, Bangladesh | The project aims to train the selected community leaders and raise awareness of the public/government services which are available and how to get access to those services through holding bi-monthly meetings between the government Department of Social Services (DSS) (as service providers) and the Community Development Committees (CDCs) as democratically elected representation of rights holders as well as bi-monthly meetings between CDCs and their respective communities at the community level. |